|
Primary connections to be made were: flow from boiler to store, flow from store to radiator circuit, return from store to boiler, and return from heating to boiler. Also, pressure relief (relocated from store) to outside. We left spare (isolated) flow and return connections for another radiator circuit to go in later. |