MCZ / Red 365 Installation & Commissioning, Service & Maintenance and Intervention forms

Solution

The documents attached below comprise the Installation & Commissioning, Service and Maintenance, and Intervention forms that must be completed by the attending engineer.

 

The first two forms are contained within the same document

 

Installation and Commissioning form

 This form must be completed upon commissioning of an MCZ / Red 365 pellet boiler or stove. A copy of the form should be left with the client, and a copy returned to Specflue, together with copies of additional supporting documents or images as required. The product shall be regarded as covered by the manufacturers warranty subject to receipt by Specflue of the competed form, and the commissioning having been undertaken by an engineer registered under an appropriate Competent Persons scheme for Biomass (See form for further details).

Service and Maintenance form

This form must be filed out upon completion of scheduled maintenance of an MCZ / Red 365 pellet boiler or stove. A copy of the form should be left with the client, and a copy returned to Specflue, together with copies of additional supporting documents or images as required. The product shall be regarded as covered by the manufacturers warranty subject to receipt by Specflue of the competed form, and the commissioning having been undertaken by an engineer registered under an appropriate Competent Persons scheme for Biomass (See form for further details).

 

Intervention report

This form to be completed by an engineer (Specflue Service & Maintenance Manager or appointed sub contractor) upon completion of an unscheduled repair intervention. The attending engineer will be appointed by the Specflue Service & Maintenance team subject to prior technical assistance provided and progression of the request through the intervention process.

Attachments:
SF_Installation_Commissioning-and-Service_Maintenence-Docs.pdf SF_Installation_Commissioning-and-Service_Maintenence-Docs.pdf
SF_Intervention-Report-form.pdf SF_Intervention-Report-form.pdf

 
Was this article helpful? yes / no
Article details
Article ID: 13
Category: MCZ and RED Boilers
Date added: 2012-10-23 11:59:13
Views: 2084
Rating (Votes): Article rated 2.3/5.0 (3)

 
« Go back

 
Powered by Help Desk Software HESK - brought to you by Help Desk Software SysAid