Compact Pump Group Installation Guide - electrical connections

Solution

Note: This document must be read in conjunction with the Compact Circulation Pump Kit Installation manual, and the User/Instal instructions for the Compact boiler.

The Compact range of boilers are supplied with the pump group assembly as a separate loose item, to be installed on site. This is because there are four different pump group variants that the boiler can be ordered with:

  • Standard pump without DHW kit
  • Standard pump with DHW kit
  • High efficiency pump without DHW kit
  • High efficiency pump with DHW kit

The boilers are now ordered from MCZ in the high efficiency variant only, and the DHW kit is not offered for sale in the UK due to its poor performance and the risk of increased tarring of the combustion chamber & heat exchangers.

There are two main sets of electrical connections to be made between the pump group and the boiler:

  1. The power supply lead for the pump itself
  2. The air and water pressure switch connections.

The pump power lead is found as a loose item in the carton with the pump. It has a plug on one end that connects to the dedicated socket on the pump The other end are bare conductors - see picture below:

 

Connect the plug to the socket on the pump and place the pump group assembly loose onto the platform at the rear of the boiler - see below:

 

 

Now refer to the pump group installation manual - page 54 (extract shown below).

 

 

 

 

The pump live and neutrals need to be wired into the motherboard at the terminals shown. The motherboard, in the rear of the boiler and above the pump position, is orientated at 90 degrees to that shown in the drawing above. See below for the correct terminal positions as you will actually see them:

 

 

Note that the neutral position will already have a connection in it (it is the neutral for the 3 way valve terminals) so care will be needed to introduce the pump neutral. There is a loose crimp terminal for the earth to connect to. Once the conductors have all been connected, the wiring should appear thus:

 

The next step is to connect up the terminals on the water pressure switch on the pump . Again, refer to the pump group installation manual - page 54 (also see extract of drawing above).

In the void where the pump group will sit, you will observe two sets of unconnected leads - one with green insulated sockets, and one set with black - as follows:

 

It is the leads with green insulation that connect to the water pressure switch. The leads with black insulation are Not used in this installation and should be left unconnected (they would connect to the flow switch on the DHW version of the pump group).

Referring to the green leads: One lead can be traced back to the motherboard whilst the second lead connects to the air pressure switch. The lead that connects to the motherboard needs to be connected to the normally open termial on the pressure switch, whilst the other lead that goes to the air pressure switch connects to the common terminal. Once done, it should appear thus:

 

The plumbing connections (boiler flow, return, pressure gauge) can now be made. The pre-formed flow & return pipes supplied loose connect to the pump as shown below (pump removed from boiler for clarity):

The pump is then screwed down to the boiler structure to complete installation.

 

 
Was this article helpful? yes / no
Article details
Article ID: 37
Category: MCZ and RED Boilers