DEDICATED PRESSURE SYSTEMS LTD.

The Institute of PlumbingTelephone 01372 803 675
Fax 01372 803 678
Email dps@heatweb.com
 
Internet http://www.heatweb.com

 9-19 Manor Green Road, Epsom, Surrey KT19 8RA

Specification 5670-5
DPS Pandora

27/06/03

Heat Bank System  
Stowaway advanced F+E  
Pandora Air System  
14 Plate Heat Exchanger (30 ltr/min)  
Indirect  
40mm Foam Insulation  
High duty primary coil  
S-Plan primary controls  
Sealed primary system  
12 litre Primary Expansion Vessel  
Fitted programmer  
Fitted Primary Pump, 6m head  
All fitted controls are wired  
Manual Fill - No Overflow  
Thermostatic Blending Valve, Heatguard 22mm  
28mm Primaries  
Backup Immersion Heater  
Cased  
Internal Inhibitor  

Unit Code

CPC-130-IND-SP-SS CPC-150-IND-SP-SS CPC-180-IND-SP-SS CPC-210-IND-SP-SS CPC-250-IND-SP-SS

Capacity [litres]

130 150 180 210 250

Base Diameter [mm]

450 450 450 450 450

Overall Diameter [mm]

530 530 530 530 530

Height [mm]

1200 1300 1550 1750 2000

1   Internal Expansion Vessel
2   Plate Heat Exchanger
3   Heat Exchanger Pump
4   Flow Switch
5   Thermostatic Blending Valve, RWC Heatguard 22mm
7   Automatic Air Vent
9   Store Filling Point
11  Y-Pattern Strainer (supplied loose)
12  Anti-Pressure Valve
14  Immersion Heater 3kW Incaloy with Stat
16  Cold Mains In, 22mm
17  Hot Mains Out, 22mm
18  Drain Cock
19  Flow From Boiler 28mm
21  Flow to Primary Coil
22  Return from Primary Coil
23  Flow to Heating 28mm
25  By-Pass Connection 22mm
26  Primary Pump UPS 15/60
29  Primary Coil Balancing Valve
30  Primary Expansion Vessel 12 litres
32  Pressure Relief Valve with Gauge 3 bar 1/2''
33  Programmer Danfoss CP715
34  Programmable Room Stat
35a Two Port Zone Valve - Hot Water 22mm
35b Two Port Zone Valve - Heating 28mm
38  Cylinder Thermostat (with Immersion Pocket)
39  White Coated Steel Casing
42  Wiring Centre
55  Blanked Boss for Optional Water Level Switch
88  Anti-Vacuum Valve 3/4"


S-Plan Indirect Sealed System Pandora


Corrosion Inhibitor is supplied already added into the store after factory testing of the unit.  Should the unit be drained down after initial filling, fresh inhibitor will be required at a ratio of 1 litre to 100 litres of store capacity.